Phase, in terms of real estate, refers to a distinct stage in the development of a large construction project. These projects are typically divided into multiple phases, each representing a specific portion of the overall development. The completion of one phase often triggers the commencement of the next.
Lansum Elena Phase 1 is a luxurious residential project located in Kokapet, Hyderabad. This project is developed by Lansum Properties LLP, a renowned real estate developer. The project is spread over 3.61 acres of land and offers 540 premium apartments. The apartments have 3 & 4 BHK configurations. The size of the 3 BHK apartments is 2640 sq.ft., while the 4 BHK apartments range from 3259 to 3775 sq. ft.
Lansum Elena Phase 1 is currently under construction and is expected to be completed by December 2028. The price range for the apartments is between ₹2.21 Cr and ₹3.38 Cr.
The Phase 1 of the project is crafted with a theme that blends luxury with comfort. Every apartment is designed to be spacious, offering residents plenty of room for comfortable living. The interior design is thoughtfully planned, with vitrified tiles adorning the master bedroom and other bedrooms. The kitchen comes fitted with high-quality fittings from well-known brands and a countertop made of granite.
Lansum Elena Phase 1 offers more than just opulent residences; it also provides top-tier amenities and facilities. This phase features a large 50,000 sqft clubhouse that houses a swimming pool. Additional amenities include lawns, gardens, a swimming pool, sports courts, and more.
In conclusion, Lansum Elena Phase 1 is a perfect mix of luxury and comfort. It has premium apartments, great facilities, and is in a prime location. It’s a top choice for first-time buyers or property investors.
Type | Apartment |
Location | Kokapet, Hyderabad |
Builder | Lansum Properties LLP |
Floor Plans | 3 & 4 BHK |
Total Land Area | 3.61 acres |
TOTAL LAND AREA | 3.61 ACRES |
Clubhouse Size | 50000 sqft. |
Number of units on a floor | 5 units |
Number of Floors | 55 in each tower |
Launch Date | February 2024 |
Date of Completion | December 2028 |
Enquiry |